Levels of building automation application development¶
To have a rough scale of complexity and support focused communication, we use the following scale of application development in the building automation field:
| Level | Elements | Examples | 
|---|---|---|
| 6 | Multi-plant optimization and control strategies | |
| 5 | Complete plants | |
| Single room automation | ||
| 4 | Complex aggregates | Air conditioning, cogeneration (CHP), absorption refrigeration | 
| 3 | Simple aggregates | Fan coil, heat pump | 
| Complex control strategies | Load / unload control of thermally activated components, h,x-controlled | |
| 2 | Complex actuators | Dual pump (redundant / parallel) | 
| Computation of physics | Enthalpy, cooling limit temperature | |
| Control algorithm | PID, characteristic map controllers, adaptive controllers | |
| 1 | Sensors | Combined temperature / humidity sensor | 
| Simple actuators | Continuous valve | |
| Simple algorithm | Command execution monitoring | 
